Eurowat technology

EUROWAT Technologies.

Aurangzeb Block Garden Town, Lahore. Olympic House, Ilford, London , UK.

Email · Chemart.office@gmail.com.

Energy- water- Climate health Justice Services .

EUROWAT Technologies.

Aurangzeb Block Garden Town, Lahore. Olympic House, London, Ilford IG1 1BA, UK.

Email · Chemart.office@gmail.com.

EuroWat technologies, Pakistan /Europe pleased to submit the project proposal along with the technical and financial details/ Return on investment ROI Data.

  • Team EuroWat with experience in successful projects at SHAMUS -1 UAE, Masdar city AbuDhabi, and Solar Paris -Sud can manage your energy & Environment system for the highest efficiency at the lowest cost with the intelligent solar energy management system.
  • Though we can design a 03 +03 inverter system too 03 KW system you already keep is PWM which can waste 40% of your solar harvested energy. Therefore, the MPPT inverter is inevitable and it will save money more than the PWM system.

SOLAR IRRADIANCE CHART FOR Lahore

EUROWAT Technologies.

Aurangzeb Block Garden Town, Lahore. Olympic House, Ilford, London , UK.

Email · Chemart.office@gmail.com.

                              Figure 1: Solar Irradiance Information for mean point in Punjab, Pakistan.

 

From the above graph, it is clear that the irradiation in this area is ample and distributed evenly throughout the year. The annual averaged daily peak solar hour is 6.45 PSH.

DAILY SOLAR IRRADIANCE LEVEL FOR SITE OF INSTALLATION-AVG.

                                            Figure 2: Average Solar Radiation Pattern for Lahore Pakistan.

 

Figure # 02 shows the average solar radiation pattern data for Bhakkar, Pakistan. The design of the proposed solar PV power system is based on this solar irradiance pattern.

 

DAILY SOLAR ENERGY GENERATION (KWH)  INSTALLATION(06 KWp)

 

Figure 3: Monthly Average Energy Generation (KWH).

             

*ACTUAL VALUES MAY BE AFFECTED BY SOLAR RADIANCE LEVEL, AMBIENT TEMPERATURE, FOG AND SMOGGY WEATHER, ENVIRONMENTAL POLLUTION, RAINFALL, ELECTRICAL POWER & PHASE FAILURES, FREQUENCY FLUCTUATIONS, AND AVAILABILITY OF GRID POWER.

HOME Products / E-shop

(link Chemart.pk) 

Services Projects  Request a Quote Contact

Fbook twitter youtube instgram

Residential Solutions

EuroWat.  successfully caters to all three sectors of domestic, commercial, and industrial clients. From a small-scale domestic system such as 1kva to multi-megawatt Housing projects.

Residential Solutions

EuroWat.  successfully caters to all three sectors of domestic, commercial and industrial clients. From a small-scale domestic system such as 1kva to multi-megawatt Housing projects.

Commercial Solutions

EuroWat has achieved commendable success in the commercial sector of Pakistan. The company has set efficacious voyage of providing solar solutions to various commercial units such as hospitals, schools, offices, and renowned companies and organizations of Pakistan.

           Industrial Solutions

EuroWat own ready to install state of the art Grid-Tied Solar Solutions. Smart Solar holds the record of installing the largest and second largest Grid Tied Solar Power Plant for the Textile Sector of Pakistan.

Solar Agriculture  Solutions

    Generally, Solar water Pumping either in agriculture or water /wastewater services sector can be operated by Solar PV driven Variable frequency drive and these  do not incorporate batteries for storing electricity.

 

 

Price Validity

Due to uncertainly in US $ rate vs PKR , the prices are valid for 02 days only. The product prices are linked with USD-PKR Parity and impact of any depreciation in the local currency with respect to USD will be charged separately to the customer at the time of system deployment.
Payment Terms Advance payment Item Delivered at Site On Completion of Work
70% 20% 10%
Order Confirmation Order will be confirmed upon receiving down payment
After Sales Services 1/2 year free after sales services
Installation Time Within two week from the date of order confirmation
Efficiency  Audit 1/2  year free-of-cost  Efficiency  Audit  service. Client will be provided with the basic level maintenance manual. Customer will be charged for O&M at site.
Civil Work All Civil Work (Material, Labour etc) Provide by Customer Side (If required)
Standard Warranty for Electrical Installation.
Company not liable for any lose due to extreme weather after installation.

TERMS & CONDITIONS:

Customer’s Signature                                                   Signature of CEO

 

Engr. Faraz Ali

for

Director (Technical)

 

E-mail: chemart.office@gmail.com